Attiko Metro S.A.

Contracted to produce an overall railway systems’ safety case on behalf of the operator of the Athens Metro system in order to support early opening of the Line 2 extension between Dafni and Ag. Dimitrios.

The scope of the assessment included:

  • Rolling stock
  • Signalling and automatic train protection
  • Automatic train supervision/control
  • All electrical and mechanical plant
  • Train radio
  • Extension/base project interfaces
Tram
Link-up
ISO 9001